You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

“villanova” Residential Complex, Austria

Projekti andmed

Asukoht: Vienna-Schwechat, Austria

  • 4 apartment buildings with 5 upper floors each, which are linked by 2 basement floors
  • Mansion-like group of buildings on the plot of a former brewery with a total of 100 apartments at Alnovaplatz, close to the city center 

Tellija poolsed ootused

  • Completion of the shell structure in only 12 months construction time
  • 20 cm to 30 cm thick reinforced concrete walls for the upper floors, basement walls and floor slabs

Klient

Swietelsky Baugesellschaft m.b.H.
Hochbau Ost, Grp. Nussdorf o. d. Traisen, Austria

Lisaväärtus

  • MX tie technology which can be operated from one side, the reduced number of tie points and at the same time the fact that no spacer tubes and cones are necessary with MAXIMO formwork, helped to save precious construction time
  • In particular the logical, clearly indicated assembly sequence of SKYDECK and the easy handling due to the lightweight aluminum parts reduce the shuttering times
  • By using the SKYDECK drophead, the panels and main girders can be used for the next concreting section already at an early stage. This helps to reduce the necessary amount of material on site and saves costs.
Picture of Karl Derler, supervisor, Swietelsky Baugesellschaft m.b.H., Hochbau Ost, Grp. Nussdorf o. d. Traisen, Austria
Karl Derler
Supervisor

With MAXIMO and SKYDECK, we chose the right systems for this construction project. Through our collaborative efforts, we were able to maintain the tight schedule for the shell and saved on additional costs.

PERI lahendus

  • MAXIMO wall formwork for basement walls and also for the 20 cm to 30 cm thick reinforced concrete walls of the upper floors
  • Systematic forming of the floor slabs with SKYDECK panel slab formwork
  • Forming of the reinforced concrete columns with SRS steel circular column formwork – partly in combination with MAXIMO elements

Projektis kasutatud PERI süsteemid