Two high-rise buildings which are 153 m and 178 m high

Number of floors Tower South: 56

Number of floors Tower North: 50

Construction period: 2008-2011

Architect: Burka Varacalli Architects; MAD Studio

 

 

Asukoht
Kategooria
Pilvelõhkujad ja kõrghooned
Projekti osalejad
Klient: Premform Ltd., Toronto

Projekti ülevaade

Rohkem infot projektist

Nõuded ja lahendused

Frank Colucci, General Superintendent and Sergio Vacilotto, Project Supervisor
Frank Colucci, General Superintendent and Sergio Vacilotto, Project Supervisor
Frank Colucci | Sergio Vacilotto
General Superintendent | Project Supervisor
We decided to use PERI RCS in this project for three reasons: safety for workers and for the traffic below, productivity to achieve one floor pour in 5 to 6 days and schedule improvement to avoid lost days due to wind or weather conditions.

Seotud tooted

Kas olete huvitatud PERI abist teie järgmisel projektil?

Helista numbrile +372 677 11 00 või kirjuta e-mailile peri@peri.ee

Location

Absolute World, Canada

One climbing system – two climbing methods: with protection provided by the RCS climbing protection panel, the two twisting Absolute World towers rose steadily upwards in regular weekly cycles.
One climbing system – two climbing methods: with protection provided by the RCS climbing protection panel, the two twisting Absolute World towers rose steadily upwards in regular weekly cycles.