Der Neue Zollhof (The New Zollhof)
Düsseldorf,
Germany
Extraordinary group of buildings within the cultural and media mile along the Rhine harbour in Düsseldorf. The three blocks of houses, which are up to 55 m high, consist of reinforced concrete bodies that are moved into each other and warped.
Construction period: 1996-1998
Architect: Frank O. Gehry
Asukoht
Kategooria
Elamud ja mitmekordsed ehitised
Projekti osalejad
Klient: Philipp Holzmann Bauprojekt AG
Projekti ülevaade
Rohkem infot projektist
The three spectacular buildings of the new Zollhof complex in Dusseldorf during different stages of construction.
The SKYDECK slab formwork was the right solution for this very unusual building. Using system components, the curved slab edges could be formed quickly and easily.
CNC-machined polystyrene bodies, held by TRIO panels, formed the structure for the extraordinary components.
In accordance with the requirements of the architect, push-pull props were used to support the inclined RAPID column formwork.
SKYDECK, with the large prop spacings of 1.50 m x 2.30 m, provides optimal freedom of movement during lateral transport of the materials.
The "Art and Media Centre Rheinhafen" from Frank O. Gehry is divided into three high-contrast building parts and gives the impression of a giant sculpture.
The three spectacular buildings of the new Zollhof complex in Dusseldorf during different stages of construction.
The SKYDECK slab formwork was the right solution for this very unusual building. Using system components, the curved slab edges could be formed quickly and easily.
CNC-machined polystyrene bodies, held by TRIO panels, formed the structure for the extraordinary components.
In accordance with the requirements of the architect, push-pull props were used to support the inclined RAPID column formwork.
SKYDECK, with the large prop spacings of 1.50 m x 2.30 m, provides optimal freedom of movement during lateral transport of the materials.
The "Art and Media Centre Rheinhafen" from Frank O. Gehry is divided into three high-contrast building parts and gives the impression of a giant sculpture.
Nõuded ja lahendused
Werner Meyer
Main foreman
For this extraordinary building, an enormous degree of expertise and flexibility on the spot is required.
Kas olete huvitatud PERI abist teie järgmisel projektil?
Helista numbrile +372 677 11 00 või kirjuta e-mailile peri@peri.ee
Location
Der Neue Zollhof (The New Zollhof), Germany