Lanaye Lock Bridge, Belgium - In the complex area with an extremely tight outer radius, the concentrated loads of the radially-arranged cantilever brackets are transferred into the available bridge piers by means of pressure supports.

Lanaye Lock Bridge
Lanaye, Belgium

Steel composite bridge over the Lanaye lock facility, length 200 m, width 15 m

 

 

Asukoht
Kategooria
Tellingute projektid
Projekti osalejad
Klient: BESIX, Brussels

Projekti ülevaade

Rohkem infot projektist

Nõuded ja lahendused

Lanaye Lock Bridge: Pedro de Guia, Technical Manager
Lanaye Lock Bridge: Pedro de Guia, Technical Manager
Pedro de Guia
Technical Manager
Due to our positive experience with similar projects, we decided once again in favour of PERI. Their technical support within the framework of the tight schedule as well as the project solution using the formwork carriage and cantilever brackets have confirmed our decision.

Seotud tooted

Kas olete huvitatud PERI abist teie järgmisel projektil?

Helista numbrile +372 677 11 00 või kirjuta e-mailile peri@peri.ee

Location

Lanaye Lock Bridge, Belgium

Lanaye Lock Bridge, Belgium - In the complex area with an extremely tight outer radius, the concentrated loads of the radially-arranged cantilever brackets are transferred into the available bridge piers by means of pressure supports.
Lanaye Lock Bridge, Belgium - In the complex area with an extremely tight outer radius, the concentrated loads of the radially-arranged cantilever brackets are transferred into the available bridge piers by means of pressure supports.