35 km railway tunnel in mining construction technique. The mining-type tunnel driving with a total of almost 16 million tons of excavated material was carried out with tunnel drilling machines (20%), and 80% was blown up.
Construction time until commissioning: 1999 - 2007
Tunnel cross section of a width of 15.74 m and a height of 12.54 m
Schweizer Alp Transit Consortium (SATCO)
Adaptable tunnel modular construction kit suitable for the jobsite
PERI offered the most efficient solution for our jobsite. The adaptable PERI modular construction kit for the jobsite with pre-assembled units excellently fulfilled all our requirements.
Valdmäe 8, 76406 Saku vald
Harjumaa, Eesti
Tel: +372 677 11 00
E-post: peri@peri.ee
Käesolev koduleht kasutab küpsiseidKüpsised on olulised veebilehe korralikuks toimimiseks. Teile parema kogemuse võimaldamiseks kasutame küpsiseid, mis mäletavad teie sisselogimise infot ja võimaldavad turvalise sisselogimise. Ühtlasi koguvad veebilehe optimeerimiseks statistikat ja toovad teieni teid huvitava sisu. Küpsiste aktsepteerimiseks klikake „Nõustun ja jätka“ ning liikuge edasi otse saidile või klikake „Meie andmekaitse teatis“, et näha detailset informatsiooni küpsise tüüpide kohta ning valige, kas aktsepteerite teatud küpsiseid saidil viibides.
Meie andmekaitse teatis