Los Ramones II Pipeline
San Luis Potosi,
Mexico
45 square supports of 2.00 m in height with edge lengths from 40 cm to 50 cm
Asukoht
Projekti osalejad
Klient: RUBA Arquitectos, SA de CV, Mexico
Projekti ülevaade
Rohkem infot projektist
Easy to mount and move manually
Due to the instruction in assembly, cleaning and storage by the PERI supervisor, the construction team worked efficiently right from the start.
DUO is a real hand-set formwork: the largest panel with 90 cm x 135 cm weighs less than 25 kg and can easily be carried by hand.
DUO Multi Panels are used to realise reinforced concrete supports. A circumferential PERI UP scaffold ensures safe working conditions.
Easy to mount and move manually
Due to the instruction in assembly, cleaning and storage by the PERI supervisor, the construction team worked efficiently right from the start.
DUO is a real hand-set formwork: the largest panel with 90 cm x 135 cm weighs less than 25 kg and can easily be carried by hand.
DUO Multi Panels are used to realise reinforced concrete supports. A circumferential PERI UP scaffold ensures safe working conditions.