The two-storey supporting structure, with a height of 25 metres, accommodates the sorption installation for the flue gas desulphurisation.

Power plant Belchatow
Belchatow, Poland

Combustion gas desulphurisation sorption plant of the lignite-fired power plant Belchatow. Largest lignite-fired power plant in Europe with an electrical capacity of 4,700 MW.

Construction period: 2008-2011

 

 

Asukoht
Projekti osalejad
Klient: Alstom S.A. (general contractor); Budimex-Dromex S.A., Krakow (structural work)

Projekti ülevaade

Rohkem infot projektist
1 /
6
The two-storey supporting structure, with a height of 25 metres, accommodates the sorption installation for the flue gas desulphurisation.
The two-storey supporting structure, with a height of 25 metres, accommodates the sorption installation for the flue gas desulphurisation.
The two-storey supporting structure, with a height of 25 metres, accommodates the sorption installation for the flue gas desulphurisation.

Nõuded ja lahendused

Nõuded
Two-storey supporting structure with massive reinforced concrete parts while adhering to tiny dimensional tolerances for the acceptance of 55 m high steel silos transfer of high loads in great heights

Lahendused
Shoring solution for 25-80 cm thick slabs and 2.20-3.20 m high beams as well as massive reinforced concrete rings logistics service combination of the shoring systems MULTIPROP, ST 100 and HD 200 MP towers set into each other load distribution via girder grids to the beams of the intermediate ceiling

Lisaväärtus
Execution in short construction time
Avoidance of additional temporary support

Poland’s largest foundation for turbo generators is part of the new Belchatow power plant block. In cooperation with Budimex-Dromex, PERI worked out a technically sophisticated shoring solution. The PERI systems, in connection with the excellent logistical service, enabled us to carry out the construction work in a short time.
Eugeniusz Koper
Project leader

Seotud tooted

Kas olete huvitatud PERI abist teie järgmisel projektil?

Helista numbrile +372 677 11 00 või kirjuta e-mailile peri@peri.ee

Location

Power plant Belchatow, Poland

The two-storey supporting structure, with a height of 25 metres, accommodates the sorption installation for the flue gas desulphurisation.
The two-storey supporting structure, with a height of 25 metres, accommodates the sorption installation for the flue gas desulphurisation.