Two-storey supporting structure with massive reinforced concrete parts while adhering to tiny dimensional tolerances for the acceptance of 55 m high steel silos transfer of high loads in great heights
Lahendused
Shoring solution for 25-80 cm thick slabs and 2.20-3.20 m high beams as well as massive reinforced concrete rings logistics service combination of the shoring systems MULTIPROP, ST 100 and HD 200 MP towers set into each other load distribution via girder grids to the beams of the intermediate ceiling
Lisaväärtus
Execution in short construction time
Avoidance of additional temporary support
Poland’s largest foundation for turbo generators is part of the new Belchatow power plant block. In cooperation with Budimex-Dromex, PERI worked out a technically sophisticated shoring solution. The PERI systems, in connection with the excellent logistical service, enabled us to carry out the construction work in a short time.
Eugeniusz Koper
Project leader
Kas olete huvitatud PERI abist teie järgmisel projektil?
Helista numbrile +372 677 11 00 või kirjuta e-mailile peri@peri.ee
Location