Power plant Belchatow
Belchatow,
Poland
Combustion gas desulphurisation sorption plant of the lignite-fired power plant Belchatow. Largest lignite-fired power plant in Europe with an electrical capacity of 4,700 MW.
Construction period: 2008-2011
Asukoht
Projekti osalejad
Klient: Alstom S.A. (general contractor); Budimex-Dromex S.A., Krakow (structural work)
Projekti ülevaade
Rohkem infot projektist
The two-storey supporting structure, with a height of 25 metres, accommodates the sorption installation for the flue gas desulphurisation.
The modular MULTIPROP system and the ST 100 stacking towers were ideally combined. Rentable SRZ and SRU steel walers taken from the VARIO wall formwork programme were used for load distribution.
Four reinforced concrete rings, each with a 6 m internal radius, served to accommodate the 55 m high steel containers which contain the sorbent.
The 3 m thick reinforced concrete bearing for the turbo-generator was installed at a height of 18 m - for this, HD 200 heavy-duty props were combined with HDT main beams.
Combined HD 200 prop segments made of steel and aluminium allowed loads to be reliably and effectively transferred. At the same time, this created more working space and shortened assembly times.
The 1.40 x 1.40 m column cross-sections were formed with TRIO. For the reinforcement work and forming operations, PERI UP reinforcement scaffold – supported on MULTIPROP towers – provide maximum safety.
The two-storey supporting structure, with a height of 25 metres, accommodates the sorption installation for the flue gas desulphurisation.
The modular MULTIPROP system and the ST 100 stacking towers were ideally combined. Rentable SRZ and SRU steel walers taken from the VARIO wall formwork programme were used for load distribution.
Four reinforced concrete rings, each with a 6 m internal radius, served to accommodate the 55 m high steel containers which contain the sorbent.
The 3 m thick reinforced concrete bearing for the turbo-generator was installed at a height of 18 m - for this, HD 200 heavy-duty props were combined with HDT main beams.
Combined HD 200 prop segments made of steel and aluminium allowed loads to be reliably and effectively transferred. At the same time, this created more working space and shortened assembly times.
The 1.40 x 1.40 m column cross-sections were formed with TRIO. For the reinforcement work and forming operations, PERI UP reinforcement scaffold – supported on MULTIPROP towers – provide maximum safety.
Nõuded ja lahendused
Poland’s largest foundation for turbo generators is part of the new Belchatow power plant block. In cooperation with Budimex-Dromex, PERI worked out a technically sophisticated shoring solution. The PERI systems, in connection with the excellent logistical service, enabled us to carry out the construction work in a short time.
Eugeniusz Koper
Project leader