The temporary works provided support to the 14.50m 2-floor element and pvodided a matrix of steel-deck working platforms enabling safe access and close monitoring during massive concrete pours

Royal Victoria Hospital
Belfast, United Kingdom

A cantilever deck of  30,000m² floor deck slab with concrete-to-floor slab volume of approx. 8,000m³.  

400mm thick RC slab with an additional grid of 2.40m x 2.50m concrete beams on top.

Asukoht
Projekti osalejad
Klient: NN

Projekti ülevaade

  

Nõuded ja lahendused

"PERI provided a total project solution and delivered excellent quality design."
Michael Lynch
Project Director

Seotud tooted

Kas töötate sellise projekti kallal?

Helista numbrile +372 677 11 00 või kirjuta e-mailile peri@peri.ee

Location

Royal Victoria Hospital, United Kingdom

The temporary works provided support to the 14.50m 2-floor element and pvodided a matrix of steel-deck working platforms enabling safe access and close monitoring during massive concrete pours
The temporary works provided support to the 14.50m 2-floor element and pvodided a matrix of steel-deck working platforms enabling safe access and close monitoring during massive concrete pours