Sheikh Khalifa Bridge, Abu Dhabi, United Arab Emirates - The large spans in the middle bridge sections were concreted by means of the balanced cantilever method.

Sheikh Khalifa Bridge
Abu Dhabi, United Arab Emirates

Connection between Abu Dhabi City and Saadiyat Island

Length: 1,455 m

Width: 60 m (one of the widest bridges in the world)

 

 

Asukoht
Kategooria
Tellingute projektid
Projekti osalejad
Klient: ARGE Ed. Züblin AG, Saif Bin Darwish Engineering Contractor

Projekti ülevaade

Rohkem infot projektist

Nõuded ja lahendused

statement-sheikh-khalifa-bridge-peri-formwork
statement-sheikh-khalifa-bridge-peri-formwork
Jens Nagel
Deputy Project Manager | Site Manager
From PERI, we are used to getting reliability - for the technical support and the systems. The formwork solution used with VARIO and raised formwork units is extremely stable and the PERI UP modular scaffold is easy to install and flexible in use. The moving procedure is carried out with large-sized transportable units. With the PERI formwork solution for the cantilevered construction, it was possible for us to minimize the work involved for adapting to the different bridge cross-sections from cycle to cycle.

Seotud tooted

Kas olete huvitatud PERI abist teie järgmisel projektil?

Helista numbrile +372 677 11 00 või kirjuta e-mailile peri@peri.ee

Location

Sheikh Khalifa Bridge, United Arab Emirates

Sheikh Khalifa Bridge, Abu Dhabi, United Arab Emirates - The large spans in the middle bridge sections were concreted by means of the balanced cantilever method.
Sheikh Khalifa Bridge, Abu Dhabi, United Arab Emirates - The large spans in the middle bridge sections were concreted by means of the balanced cantilever method.