Thames Tideway Tunnel - Victoria Embankment
London,
United Kingdom
The Tideway project will redirect sewage overspill from the most polluting overflow points via purpose-built shafts along the River Thames. These shafts will transfer the sewage into a newly constructed main tunnel underground.
The central section of the Thames Tideway Tunnel has progressed the furthest to date. At the Victoria Embankment site, one of the most visible sites in this section, we provided temporary works systems for a 49m-deep shaft along with a connection tunnel that will collect spillage and transfer it to the main underground tunnel.
Asukoht
Projekti ülevaade
The Tideway project will redirect sewage overspill from the most polluting overflow points via purpose-built shafts along the River Thames.
These shafts will transfer the sewage into a newly constructed main tunnel underground.
We provided temporary works systems for a 49m-deep shaft along with a connection tunnel that will collect spillage and transfer it to the main underground tunnel.
We supported the construction of the secondary lining with: SCS Climbing System, RCS MAX Rail Climbing System, VARIO GT 24 Girder Wall Formwork, PERI UP Flex Stair 100/125.
The Tideway project will redirect sewage overspill from the most polluting overflow points via purpose-built shafts along the River Thames.
These shafts will transfer the sewage into a newly constructed main tunnel underground.
We provided temporary works systems for a 49m-deep shaft along with a connection tunnel that will collect spillage and transfer it to the main underground tunnel.
We supported the construction of the secondary lining with: SCS Climbing System, RCS MAX Rail Climbing System, VARIO GT 24 Girder Wall Formwork, PERI UP Flex Stair 100/125.