Tošanovice-Žukov Bridge, Czech Republic

Projekti andmed

Asukoht: Ostrava, Tšehhi

Design: steel composite bridge
Length: 720 m

Tellija poolsed ootused

The strut axes open out from 6.50 m to 9.00 m in the centre of the bridge.

Klient

Metrostav a.s., Division 4, Prague

Lisaväärtus

  • flexible connecting possibilities for steel walers, scaffold tubes, heavy-duty spindles and tie rods
  • can be adapted to various main beam spacings
Martin Šimek, Site Manager
Martin Šimek
Site Manager

The erection of steel composite bridges is considerably easier and much faster with the PERI formwork carriage construction.

PERI lahendus

Two modular formwork carriages from the VARIOKIT system