Trmice Motorway Bridge, Aussig, Czech Republic - For the 1,083 m long Trmice motorway bridge near Aussig in the Czech Republic, 59 piers were cost-effectively formed using PERI formwork.

Trmice Motorway Bridge
Aussig, Czech Republic

S-shaped motorway bridge in a steel composite construction with counter-positioned and changing radii, plus 59 y-shaped piers of architectural concrete quality.

Design: girder bridge
Overall length: 1,083 m
Height: max. 27 m
Number of piers: 59

 

 

Asukoht
Kategooria
Tellingute projektid
Projekti osalejad
Klient: Metrostav a.s., Division 4, Prague

Projekti ülevaade

Rohkem infot projektist

Nõuded ja lahendused

Pavel Kouba, Project Manager
Pavel Kouba, Project Manager
Pavel Kouba
Project Manager
PERI provided the most cost-effective formwork solution for constructing the piers and superstructure.  Using the PERI composite formwork carriage resulted in considerable cost savings for us.  In addition, normal rail traffic operations could be maintained during the entire construction period.

Seotud tooted

Kas olete huvitatud PERI abist teie järgmisel projektil?

Helista numbrile +372 677 11 00 või kirjuta e-mailile peri@peri.ee

Location

Trmice Motorway Bridge, Czech Republic

Trmice Motorway Bridge, Aussig, Czech Republic - For the 1,083 m long Trmice motorway bridge near Aussig in the Czech Republic, 59 piers were cost-effectively formed using PERI formwork.
Trmice Motorway Bridge, Aussig, Czech Republic - For the 1,083 m long Trmice motorway bridge near Aussig in the Czech Republic, 59 piers were cost-effectively formed using PERI formwork.