Projekti ülevaade
Rohkem infot projektist
Nõuded ja lahendused
F. Paiva, A. Monteiro, J. Campos, P. Rosa, J. Marques
Site Management
With the VST heavy duty tower we were able to adapt the support to the different heights. The assembly work was safe and quick thanks to the pre-assembled units.
Kas olete huvitatud PERI abist teie järgmisel projektil?
Helista numbrile +372 677 11 00 või kirjuta e-mailile peri@peri.ee
Location
Motorway bridge over the Rio Sordo, Portugal
![Motorway bridge over the Rio Sordo, Vila Real, Portugal - Up to 30 m high VARIOKIT VST heavy-duty shoring towers served as falsework for the construction of the bridge edge sections. Each leg carried a load of around 600 kN.](https://cdn.peri.cloud/.imaging/mWide/dam/155c2801-63b5-4c03-9bfc-da12d711ab37/83037/motorway-bridge-over-the-rio-sordo-variokit-vst-heavy-duty-shoring-towers.jpg)
![Motorway bridge over the Rio Sordo - VARIOKIT VST heavy-duty shoring towers Motorway bridge over the Rio Sordo, Vila Real, Portugal - Up to 30 m high VARIOKIT VST heavy-duty shoring towers served as falsework for the construction of the bridge edge sections. Each leg carried a load of around 600 kN.](https://cdn.peri.cloud/.imaging/mWide/dam/155c2801-63b5-4c03-9bfc-da12d711ab37/83037/motorway-bridge-over-the-rio-sordo-variokit-vst-heavy-duty-shoring-towers.jpg)