Motorway bridge over the Rio Sordo, Vila Real, Portugal - Up to 30 m high VARIOKIT VST heavy-duty shoring towers served as falsework for the construction of the bridge edge sections. Each leg carried a load of around 600 kN.

Motorway bridge over the Rio Sordo
Vila Real, Portugal

A4 motorway bridge across the Rio Sordo in the Marão mountains.

Design: Five-section bridge with two separate superstructures
Construction process: Cantilever method, edge spans on falsework
Overall length: 412 m

 

 

Asukoht
Kategooria
Tellingute projektid
Projekti osalejad
Klient: INFRATÚNEL, Construtores do Túnel do Marão A.C.E., Porto

Projekti ülevaade

Rohkem infot projektist

Nõuded ja lahendused

Default Person
Default Person
F. Paiva, A. Monteiro, J. Campos, P. Rosa, J. Marques
Site Management
With the VST heavy duty tower we were able to adapt the support to the different heights. The assembly work was safe and quick thanks to the pre-assembled units.

Seotud tooted

Kas olete huvitatud PERI abist teie järgmisel projektil?

Helista numbrile +372 677 11 00 või kirjuta e-mailile peri@peri.ee

Location

Motorway bridge over the Rio Sordo, Portugal

Motorway bridge over the Rio Sordo, Vila Real, Portugal - Up to 30 m high VARIOKIT VST heavy-duty shoring towers served as falsework for the construction of the bridge edge sections. Each leg carried a load of around 600 kN.
Motorway bridge over the Rio Sordo, Vila Real, Portugal - Up to 30 m high VARIOKIT VST heavy-duty shoring towers served as falsework for the construction of the bridge edge sections. Each leg carried a load of around 600 kN.