Projekti ülevaade
Rohkem infot projektist
Nõuded ja lahendused
![Puente Baluarte - Salvador Sánchez Núñez, Project Manager](https://cdn.peri.cloud/.imaging/lPortrait/dam/f618516a-0665-4e65-a29e-f468de7f1aa1/82912/puente-baluarte-salvador-s%C3%A1nchez-n%C3%BA%C3%B1ez-project-manager.jpg)
![Puente Baluarte - Salvador Sánchez Núñez, Project Manager Puente Baluarte - Salvador Sánchez Núñez, Project Manager](https://cdn.peri.cloud/.imaging/lPortrait/dam/f618516a-0665-4e65-a29e-f468de7f1aa1/82912/puente-baluarte-salvador-s%C3%A1nchez-n%C3%BA%C3%B1ez-project-manager.jpg)
Salvador Sánchez Núñez
Project leader
We are extremely satisfied with the PERI systems and the efficient engineering – we were able to considerably accelerate the climbing cycles thanks to ACS. Despite the great height, we were able to work safely on the working platforms. Furthermore, we achieved excellent concrete surfaces, our customer is very satisfied.
Kas olete huvitatud PERI abist teie järgmisel projektil?
Helista numbrile +372 677 11 00 või kirjuta e-mailile peri@peri.ee
Location
Puente Baluarte, Mexico
![Puente Baluarte, Mexico - Apart from the two pylons, a total of nine double piers are being constructed on both sides of the ravine which are braced by means of massive cross beams.](https://cdn.peri.cloud/.imaging/mWide/dam/6b1fe3a4-fb8e-4975-a830-626e5211b4b7/82913/puente-baluarte-apart-from-the-two-pylons-a-total-of-nine-double-piers-are-being-constructed-on-both-sides-of-the-ravine.jpg)
![Puente Baluarte - Apart from the two pylons, a total of nine double piers are being constructed on both sides of the ravine Puente Baluarte, Mexico - Apart from the two pylons, a total of nine double piers are being constructed on both sides of the ravine which are braced by means of massive cross beams.](https://cdn.peri.cloud/.imaging/mWide/dam/6b1fe3a4-fb8e-4975-a830-626e5211b4b7/82913/puente-baluarte-apart-from-the-two-pylons-a-total-of-nine-double-piers-are-being-constructed-on-both-sides-of-the-ravine.jpg)