The LGS Weather Protection Roof on the basis of the PERI UP Scaffolding System made the roof renovation independent of the weather. The 90 m long protection roof consisted of 3 m wide and nearly 30 m long LGS segments.

Weather protection roof Gerolzhofen
Gerolzhofen, Germany

Building: Temporary weather protection roof with 30 m span for the rehabilitation of a 90 m long production hall

Construction period: 2013

 

 

Projekti osalejad
Klient: Construction company: Eugen Wahner GmbH, Sulzfeld

Projekti ülevaade

Rohkem infot projektist

Nõuded ja lahendused

Thorsten Wahner planned together with PERI engineers the roof construction and supervised their construction and dismantling.
Thorsten Wahner planned together with PERI engineers the roof construction and supervised their construction and dismantling.
Thorsten Wahner
Site Manager and General Manager
The LGS installation using ridge clasp and roles is absolutely convincing. In addition, PERI engineers demonstrated speed in their planning skills  - size, planning, statics and assembly had to be adhered to a tight schedule.

Seotud tooted

Kas olete huvitatud PERI abist teie järgmisel projektil?

Helista numbrile +372 677 11 00 või kirjuta e-mailile peri@peri.ee

Location

Weather protection roof Gerolzhofen, Germany

The LGS Weather Protection Roof on the basis of the PERI UP Scaffolding System made the roof renovation independent of the weather. The 90 m long protection roof consisted of 3 m wide and nearly 30 m long LGS segments.
The LGS Weather Protection Roof on the basis of the PERI UP Scaffolding System made the roof renovation independent of the weather. The 90 m long protection roof consisted of 3 m wide and nearly 30 m long LGS segments.