
Kõik projektid

Eesti Maakri ärikvartal Kõrghoone kiire ehitus hästi läbimõeldud raketise lahendusega

Eesti LAEV elu- ja ärihoone LAEV elu- ja ärihoone

Eesti Saustinõmme viadukti betoonitööd Saustinõmme paarisviadukt on esimene Rail Balticuga koostöös valminud viadukt ning osa uuest Luige–Saku maantee neljarajalisest lõigust.

Austria Residential Complex at North Station Vienna The use of efficient formwork systems for the walls and slabs ensured that the very tight completion deadline for the building shell could be met.

Germany 'Humboldt Forum' City Palace Berlin Reconstruction of the Berlin City Palace on Spree Island, for the most part according to the old plans. 180 m long, 120 m wide and 35 m high outer shell as well as a 70 m high cupola roof in the historical Baroque style.

United Kingdom White Collar Factory A London office building, with an innovative and sustainable design for the future

United Kingdom Concrete House, Sussex The entire cast in-situ concrete structure has been formed using DUO formwork instead of traditional timber or heavy steel shuttering throughout.

Poland National stadium Kazimierz Górski The complex construction project with highest quality requirements demanded an experienced construction site team as well as on-site support through PERI engineers.

Peru UTEC University Campus With the help of the customized PERI formwork and scaffolding solution, a new campus complex is being realized in Lima – with high architectural requirements and a tight construction schedule.

United Kingdom Hinkley Point C Meeting formwork demands on one of the largest infrastructure projects in Europe.

United Kingdom V&A East Museum, Stratford Waterfront The V&A East museum is part of the Stratford Waterfront East Bank project.

Poland Warsaw Spire With a height of 220 m, the new office tower of the "Warsaw Spire" building ensemble will be the tallest office building in Warsaw after completion. Two office buildings flank the tower, each 55 m high.

Italy MAXXI - Museo nazionale delle arti del XXI secolo National museum for art and architecture of the 21st century. 14 m high twisted walls in architectural concrete.

Portugal Foz Tua Dam PERI supplied a project-specific formwork and scaffolding solution and supported with comprehensive engineering services for the construction of the 108-m-high complex dam on the River Tua in Portugal.

Germany Galileo Satellite Control Centre The outside of the building resembles a medieval fortress. The facade is comprised of window openings as well as pre-determined regular tie points and horizontal pilaster strips.

United Kingdom New Providence Wharf Mixed use retail, residential and luxury hotel development

United Kingdom Queensferry Crossing The new Firth of Forth Crossing will be 207m above high tide and 2.7km in length.

Austria St. Martins Therme & Lodge Structural work in record time. With formwork and scaffolding systems perfectly matched each structural component, the concrete frame could be completely finished in only 9 months.

United Kingdom A52 Clifton Bridge Suspended scaffolding enables repair works on a major National Highways bridge upgrade project.

Saudi Arabia Al Rimal 511 Units Villa Project A huge housing project located in the North of Riyadh on an area of 2 million m2. It includes 511 residential units constructed by one of the most leading real estate companies in Saudi Arabia.

Australia Infrastructure buildings Pilbara DUO is particularly suitable for small-sized applications in civil engineering that are only subject to low requirements on the surfaces.

Eesti Telia büroohoone Telia büroohoone

Germany Potsdamer Platz The Potsdamer Platz is a city of the future with office and residential buildings, schools, theatres, hotels and shopping centres in the heart of Berlin. Applications for a huge variety of PERI formwork.

Germany Der Neue Zollhof (The New Zollhof) The three blocks of houses, which are up to 55 m high, consist of reinforced concrete bodies that are moved into each other and warped.

Eesti Öpiku Ärimaja B hoone Ultramodernne ja tõeliselt urbanistlik Ülemiste City ärilinnak areneb suurel kiirusel. 13-korruselisele Öpiku esimesele majale on kerkimas kõrvale ka teine, moodustades seni suurima büroohoonete kompleksi Eestis. Terav silm on kindlasti märganud seal toimuvaid ehitustöid juba mõnda aega. Nagu ka esimese maja puhul, tarnib betooniraketised PERI AS.

Eesti Sepapaja 1 büroohoone Ülemiste Citys Suur-Sõjamäe ja Lõõtsa tänava nurgal asuv Viktor Palmi maja on oluliseks maamärgiks kõigile kesklinna poolt linnakusse sisenejatele. Väljapaistva fassaadiga 12-korruselisele büroohoonele annavad aktsenti perimeetris spiraalselt ülespoole astuvad suured klaaspinnad. Maja südame moodustab kõrge esimene korrus, kus asuvad fuajee, vastuvõtulaud ning toitlustus- ja kaubanduspinnad. Hoone idaküljelt pääseb ühendusgalerii kaudu otse 510-kohalisse parkimismajja. Uue büroohoone lõunaküljele on kavandatud urbanistlik linnaväljak koos lippude, purskkaevu ning istumisalaga, kus saab tulevikus korraldada erinevaid üritusi. Hoone arhitektuurilahenduse on teinud KOKO arhitektid.

Poland Temple of Divine Providence Customised system solutions for complex requirements at great heights. Rentable PERI formwork and scaffolding systems as well as project-specific special constructions were ideally combined.

United Kingdom One Tower Bridge A mixed use development comprising of 9 blocks of 396 residential units

United Kingdom University of Glasgow Delivering a high-grade architectural finish for a world-changing university

United Kingdom Crossrail, Farringdon Station One of the most significant infrastructure projects ever undertaken in the UK, London’s Crossrail is a high-frequency, high-capacity service enabling faster travel across the capital.

Czech Republic Oparno Motorway Bridge Comprehensive system solution for arched bridges. The PERI UP protective roof construction prevent interference of rail services during the construction of the arched supporting structure using the cantilevered construction method.

United Kingdom Tottenham Court Road Station Upgrade Major upgrade of London Underground station, part of the planned interchange with Crossrail.

United States Smithland Hydroelectric Power Plant Comprehensive engineering services for construction of the power plant shell

Poland Bridge over the Dunajec Construction of the 210 m long section between the seventh and tenth bridge piers in 48 casting segments using the balanced cantilever method.

Italy Il Bosco Verticale Massive, 28 cm thick reinforced concrete balconies cantilever outwards for 3.35 m in an irregular fashion on all four sides of the building. Milan "forest" gains two metres in height every week.

United Kingdom Royal Victoria Hospital The Hospital will provide Critical Care services, an A&E department and new Maternity Unit

United Kingdom Mersey Gateway, Cheshire The Mersey Gateway is a cable-stayed bridge stretching over 2,000 m from Runcorn to Widnes.

United Kingdom The Aquatics Centre London 2012 Aquatics Centre, showcasing distinctive architecture

United Kingdom Werrington Grade Separation Travelling formwork for the UK’s first curved box jack.

United Kingdom A9 Efficient formwork and falsework for one of Scotland’s busiest roads.

Germany Forum roof Munich Airport Exceptional roof renovation during ongoing airport operations. Maximum safety was ensured through a protective roof construction installed at the height of the forum area in addition to the safety netting underneath the scaffolded roof sections.

Portugal Bridge renovation Ponte Rio Tua Renovation of the 70-year old and 120m long arched bridge over the Rio Tua. For the renovation of an arched bridge built in 1940, a scaffold construction on the basis of PERI UP modular scaffolding was erected.

United States Pegasus Sculpture, Gulfstream Park The 33 m high and 60 m long sculpture ensemble, featuring Pegasus and a dragon, was realised in a larger than life size. With the help of the PERI UP solution, more than 1,000 bronze castings could be assembled and welded on site.

Italy Parco della Musica e della Cultura Formwork and scaffolding from one source for a smooth construction progress. The complex includes a 1,800-seat opera house, a concert hall for 1,100 music lovers as well as a theatre for audiences up to 2,000.

Czech Republic Deer crossing bridge Zehun Green bridge over the D11 motorway. PERI UP Rosett formed the falsework construction. The tight construction schedule required support along the entire length of 75 m.

Spain Restaurante Florante Submarino Underwater restaurant in the “Parque Oceanográfico“ for 500 visitors, with an extraordinary roof design. Courageous architecture with extraordinary roof construction realised with PERI UP scaffolding system.

United Kingdom Newfoundland ACS helps to construct a complex and irregular core on Canary Wharf's first residential building.

Poland Viaduct Krakow-Plaszow Railway Junction 252 m long crossing over the Krakow-Płaszow railway junction using the balanced cantilever method on the basis of the VARIOKIT engineering construction kit.

Panama Panama Canal PERI systems in use for the construction project of the century. More than 12 months after starting the development work on the Panama Canal, the dimensions and the massive structural elements are clearly visible.

International Zahid Business Park A 45 m high water retention structures was built at the Zahid Business Park thanks to a comprehensive PERI solution and extensive engineering support.

Poland Mausoleum Michniów, Poland Complex architecture primarily achieved with system formwork

United States Trump International Hotel & Tower With a height of 415 m, the Trump International Hotel and Tower on the Chicago River is a very impressive skyscraper. Every week one storey higher with ACS and RCS.

Sweden Citytunnel Malmö Railway tunnel with subterranean stations, station expansion and entrance area. Cost-effective combination of formwork carriage construction and rentable system parts.

Germany Museum of military history, Dresden Modification of a historical armoury building into a spectacular museum building with a 30 m high steel-glass structure, shaped like a wedge.

Croatia Sports Arena Lora The PERI solution served as both shoring and an assembly platform on which the enormous steel trusses of the roof construction were set down, assembled and moved into position.

Estonia Meremuuseum Ajaloolise vesilennukite angaari renoveerimine PERI UP tellingute abil atraktiivseks muuseumiks.

Mexico Puente Baluarte Construction of 2 lozenged (diamond-shaped) bridge pylons for a cable-stayed bridge. Construction of 9 double piers, braced via solid crossbars.
At the time of construction, the Puente Baluarte is the third highest bridge in the world.

Czech Republic Trmice Motorway Bridge S-shaped motorway bridge in a steel composite construction with counter-positioned and changing radii, plus 59 y-shaped piers of architectural concrete quality.

United Arab Emirates Sheikh Khalifa Bridge Connection between Abu Dhabi City and Saadiyat Island. Inclined piers and impressive superstructure constructed with system formwork.

Portugal Motorway bridge over the Rio Sordo A4 motorway bridge across the Rio Sordo in the Marão mountains. In the design of a five-section bridge with two separate superstructures.

Belgium Lanaye Lock Bridge Steel composite bridge over the Lanaye lock facility, length 200 m, width 15 m.

Croatia Motorway bridge over the Drava, Osijek New construction of a 2,485 m long bridge as part of the A5 motorway development in eastern Croatia, consisting of one suspension bridge and approach bridges in the flood area of the River Drava.

France Viaduc de Millau Motorway bridge over the Tarn in Millau and longest cable-stayed bridge in the world. Highest bridge pier worldwide in best architectural concrete quality.

United Kingdom Thames Tideway Tunnel - Kirtling Street We supported the construction of multiple shafts on the Thames Tideway Tunnel project – Kirtling Street being the most challenging due to its size.

United Kingdom Thames Tideway Tunnel - Victoria Embankment We designed and provided a hybrid climbing solution to enable secondary lining works. The design incorporated our SCS climbing (single-sided climbing) system with RCS MAX pumps.

United Arab Emirates Tunnel Jumeirah Palm Island In 25 m long concreting steps and four cycle sequences, the tunnel bottom plate, two wall sections respectively and then the slab could be concreted one after the other.

United States LNG liquid gas reservoirs Cameron In the US state of Louisiana, three enormous liquid gas tanks were simultaneously realized using PERI know-how. Each of the structures has an 80 m diameter and a wall height of 44 m.

Netherlands Eemshaven Power Plant For the power plant construction in Eemshaven, the industrial scaffold system PERI UP has clearly demonstrated its flexibility and adaptability.

Mexico Los Ramones II Pipeline A new control station for a gas pipeline. DUO Multi Panels are used to realise reinforced concrete supports. A circumferential PERI UP scaffold ensures safe working conditions.

Bosnia and Herzegovina Stanari Thermal Power Plant A total of 9 circular piers with 3.60 m diameters and 40 cm wall thicknesses will subsequently carry a steel platform for the condenser. Test of strength for PERI formwork and scaffolding

Germany Weather protection roof Gerolzhofen Project-specific adjusted weather protection with system components. Building: Temporary weather protection roof with 30 m span for the rehabilitation of a 90 m long production hall.

Italy Grain Silo near Parma Nine grain silos for the expansion of storage capacities. Cost-effective PERI climbing concept: with a complete platform level and halved on-site wall formwork requirements, fast and continuous working operations were achieved.

Jordan Sewage plant As Samra Cost-effective wall and slab construction. The solutions developed by PERI engineers and the local site management, along with support provided by PERI specialists, contributed to efficient and problem-free construction.

Egypt Nile river barrage Naga Hammadi Fast climbing cycle sequences and high quality standard. The variable VARIO girder wall formwork, together with SKS climbing scaffold, formed large area transportable units.

Ukraine Cement plant Ivano-Frankowsk 43 m high silo with an inner diameter of 12 m and a 77 m high, 6-storey production facility. For extending the cement plant, engineers from PERI Ukraine designed a comprehensive and sophisticated formwork and scaffolding solution.

Poland Power plant Belchatow Combustion gas desulphurisation sorption plant of the lignite-fired power plant Belchatow. Largest lignite-fired power plant in Europe with an electrical capacity of 4,700 MW.

Italy Porta Nuova Garibaldi Each of the two towers has three reinforced concrete cores which were constructed with help of two PERI ACS self-climbing variants. 2 high-rise towers, arranged in a circle around a three-storey centre with a 100 m diameter.

Malaysia JKG Tower at Jalan Raja Laut A complete solution consisting of formwork, scaffolding and related services has guaranteed safety at all heights and rapid progress during the construction of JKG Tower complex.

Poland RONDO 1 High-rise project in the financial centre of Warsaw with a gross floor area of 100,00 m². The PERI CPP climbing protection panel reliably encloses the upper floors under construction.

Singapore Marina Bay Sands The American Las Vegas Sands Corporation is the owner of the complex the highly visible hotel towers..3 concave-shaped hotel towers with 2,600 rooms and suites. ACS and SKYTABLE minimise crane times.

United Arab Emirates 21st Century Tower Core, slabs and facade in a 3-day cycle

Russia ISET Tower The ISET Tower in Yekaterinburg is characterized by its external shape. PERI planned a comprehensive, crane-independent concept of the climbing formwork required on the elevator shafts and core walls.

Kuwait Al Hamra Tower Office skyscraper with spiral building design. Winding elegantly upwards with PERI climbing formwork.

Russia Evolution Tower Part of Moscow’s international trade centre, “Moscow City”. Each of the 52 upper floors is constantly twisted by 3° in a clockwise direction, whole rotation is 150°.

Spain Torre Agbar Impressive office tower with oval-shaped core and facade walls. The cylindrical core and facade walls of this 142 m high office building were constructed with PERI ACS self-climbing technology.

Spain Cuatro Torres Business Area For the very wide range of requirements, PERI provided the most cost-effective solution with the ACS self-climbing formwork.

United Arab Emirates Habtoor Residence Three luxury residential towers. Habtoor Residence is part of the Al Habtoor City development, one of the region's biggest development.

Serbia Avala TV Tower New landmark with panoramic view. TV Tower on the Avala Mountain. At a height of more than 100 m, the platforms offer visitors a unique view of the surrounding area.

France Hotel Mélia, La Défense For the construction of the Hotel Meliá in the La Défense office district, PERI developed a comprehensive climbing formwork solution.

Canada Absolute World One climbing system – two climbing methods: with protection provided by the RCS climbing protection panel, the two twisting Absolute World towers rose steadily upwards in regular weekly cycles.

Poland Prosta Tower Building in the city centre of Warsaw with striking concrete and glass façade. A filigree reinforced concrete net covering the glass facade of the Prosta Tower in Warsaw.

Argentina Banco de la Ciudad de Buenos Aires New headquarters of the Banco de la Ciudad de Buenos Aires. The four floors of the prestigious office complex in the Parque Patricios district are covered by a 9,000 m² undulating roof structure.

Poland DaimlerChrysler Subsidiary Warsaw New headquarters of the DaimlerChrysler Corporation in Poland and a Mercedes Benz dealership with showrooms and a service centre. Efficient shoring system solution adapted to site requirements.

Germany ADAC Headquarters Efficient complete solution with competent service

United Arab Emirates 7th Heaven - Al Barari Development A multipurpose development project built with PERI. Using PERI UP Rosett shoring system used for heights up to 14m for cantilever support.

Germany Federal Chancellery Berlin Massive falsework and gigantic floor table constructions. The challenging building form called for flexibly adaptable formwork and scaffolding systems.

Singapore Hotel Capella The new 6-star hotel complex was constructed around two buildings dating from the colonial times. With SKYDECK, the construction of the reinforced concrete slabs could be carried out efficiently and safely.

Portugal Casa da Música Concert hall with a minimalist, monolithic and polygonal shape. High, diversely angled wall areas with architectural concrete surfaces.

Poland Mausoleum Michniów Building concept which symbolizes a traditional village hut that loses its original form and crumbles into dust over time. Special architecture with numerous offsets and inclinations in the walls and roof.

Czech Republic Hradec Králové Library With an X-shaped floor plan, the architectural concept of this building created a new highlight in the urban development of the city of Hradec Králové.

Spain Edificio Ágora Multi-function centre created to resemble the helmet of a conquistador; arch-supported steel supporting structure; foldable glass roof with a lamellae-type construction.

Brazil Museum of Tomorrow For realising the extraordinary museum on time and within budget, PERI planned, produced and delivered over 3,500 customised special formwork elements.

Germany Mercedes-Benz Museum Sophisticated 3D formwork units with the highest demands on the surface quality of the visible concrete surfaces. Due to the enormous size of the components, substantial concrete loads of 150 kN/ m² had to be carried.

France Centre Pompidou The tent-like roof construction reached a height of 77 m. For the up to 32 m high PERI UP Rosett shoring towers, adapting to the complex roof geometry was carried out using system components from the VARIOKIT engineering construction kit.

Germany The Squaire The Squaire (formerly: Airrail Center Frankfurt) is an office, shopping and hotel complex above the long-distance railway station at Frankfurt Airport.

Saudi Arabia King Abdul Aziz International Airport The extension of King Abdul Aziz International Airport was one of Saudi Arabia’s biggest airport projects. The capacity was increased to handle up to 30 million passengers per year through a new 640,000 m² terminal building.

Germany BBI Airport, Berlin Brandenburg Terminal for the new Berlin Brandenburg International Airport. Structural work for passenger terminal completed in only one year.

United Arab Emirates Midfield Terminal Building X-shaped airport terminal building (Midfield Terminal Building MTB), situated between two runways, with capacity for 65 large aircraft. More than 6,000 slab tables in continuous use.

Germany Satellite (Terminal Expansion) Munich Airport The 600 m long, new satellite terminal at Munich airport is located in the centre of the airfield and encloses the apron tower and incorporates the existing baggage sorting centre. Construction is taking place during normal airport operations.

Portugal Cristo Rei Monument Christ monument surrounded by scaffolding quick and safe. Complete erection of the 28 m high monument on an 81 m high base for cleaning and renovation.

Austria Karlskirche Church, Vienna Dome refurbishment of the baroque style church including visitor gallery without restricting visitor access.

Luxembourg Hotel Le Royal Complete refurbishment of the 5-star Hotel Le Royal in the Luxembourg city centre.

Spain Edificio Ágora, Spain Elegant sculpture in flexible shoring

United Kingdom The Link PERI provides cladding and façade access to a London residential building.

Poland Traffic junction Czerniakowska Access roads with lengths of 723 m and 419 m for the intersection-free routing of the Siekierkowska roadway on the southern ring road at the traffic junction Bora Komorowskiego over 3 levels.

Kas olete huvitatud, kuidas saab PERI teie järgmist projekti toetada?
Helista numbrile +372 677 11 00 või kirjuta e-mailile peri@peri.ee